As a young team of surveyors, we are particularly proud of our participation in the following projects, which highlight our commitment to quality and precision:
• JP Gas – Ruma – Surveying of the distribution gas network and gas connections in the territory of Srem District, with integration into the utility network cadastre for 2021, 2022, and 2023.
• Divčibare Quarry – Work on the construction and installation of production lines in the stone quarry.
• Divčibare Quarry – Calculation of volumes in the stone quarry.
• Participation in the construction of the bridge over the Sava River near Šabac.
• Participation in the construction of the bridge over the Jadar River near Lešnica.
• Participation in the construction of the Šabac – Loznica expressway.
• Metalfer Steel Smelter and Rolling Mill – Monitoring of machinery assembly for production lines.
• Metalfer Steel Smelter and Rolling Mill – Inspection of parallelism and damage to crane tracks.
• Municipality of Vranjska Banja – Preparation of cadastral topographic plans for road design purposes.
• Nikola Tesla Thermal Power Plant – Monitoring of drainage pipeline construction for wastewater collection.